Zur Hauptnavigation wechseln Zur Suche wechseln Zum Hauptinhalt wechseln

IFC concepts in the execution phase of conventional tunneling projects

  • Marco Huymajer
  • , Galina Peskalova
  • , Robert Wenighofer
  • , Christian Huemer
  • , Alexandra Mazak-Huemer
  • Technische Universität Wien
  • Johannes Kepler Universität Linz

Publikation: Beitrag in FachzeitschriftArtikelForschungBegutachtung

Abstract

The documentation process of conventional tunneling projects is time-consuming and costly. Building Information Modeling (BIM) has enabled substantial productivity gains in the Architecture, Engineering, & Construction (AEC) sector. However, BIM has only been marginally adopted in the execution phase of conventional tunneling projects. For this purpose, we propose a BIM model that facilitates fully digital and automated data exchange between project stakeholders. We use the Industry Foundation Classes (IFC) as a basis and identify concepts potentially useful to represent data from the execution phase of construction projects. We demonstrate how IFC concepts are utilized to represent a shift report of a conventional tunneling project. Thereby, we deliver a reference model as an implementation guide for software developers in this domain. This may serve as a blueprint for handling construction management data in a machine-readable format, laying the foundations for Big Open BIM in the execution phase of construction projects.

OriginalspracheEnglisch
Aufsatznummer105368
Seitenumfang13
FachzeitschriftTunnelling and Underground Space Technology
Jahrgang143.2024
AusgabenummerJanuary
DOIs
PublikationsstatusVeröffentlicht - 3 Nov. 2024

Bibliographische Notiz

Funding Information:
This research was funded by the Austrian Federal Ministry of Education, Science and Research under grant number BMBWF-11.102/0033-IV/8/2019 .

Funding Information:
This research was funded by the Austrian Research Promotion Agency (FFG) under grant number 879573 .

Publisher Copyright:
© 2023 The Author(s)

Dieses zitieren