The Dump is the Target—A Reversed Mine Plan

Publikation: Beitrag in FachzeitschriftArtikelForschung

Abstract

Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
OriginalspracheEnglisch
Seiten (von - bis)71-74
Seitenumfang4
FachzeitschriftBerg- und hüttenmännische Monatshefte : BHM
Jahrgang168.2023
Ausgabenummer2
DOIs
PublikationsstatusElektronische Veröffentlichung vor Drucklegung. - 16 Jan. 2023

Dieses zitieren