Abstract
Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
| Originalsprache | Englisch |
|---|---|
| Seiten (von - bis) | 71-74 |
| Seitenumfang | 4 |
| Fachzeitschrift | Berg- und hüttenmännische Monatshefte : BHM |
| Jahrgang | 168.2023 |
| Ausgabenummer | 2 |
| DOIs | |
| Publikationsstatus | Elektronische Veröffentlichung vor Drucklegung. - 16 Jan. 2023 |
UN SDGs
Dieser Output leistet einen Beitrag zu folgendem(n) Ziel(en) für nachhaltige Entwicklung
-
SDG 8 – Anständige Arbeitsbedingungen und wirtschaftliches Wachstum
-
SDG 12 – Verantwortungsvoller Konsum und Produktion
-
SDG 15 – Lebensraum Land
Dieses zitieren
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver