Abstract
At LO Trimouns (Rio Tinto Minerals) in France the excavation of waste material is done by drilling, blasting, loading and hauling. Through a lot of measuerments and observations taken in the field an optimization of the whole drill-blast-load-haul cycle could be avhieved. Specifically it ended in a total change of the blasting pattern wich could be tested in the mine. Proposals were made regarding the change of the geometric layout of the overburden benches.
Translated title of the contribution | Optimierung von Bohren und Sprengen, Laden und Transportieren im Zuge der Abraumgewinnung bei LO Trimouns |
---|---|
Original language | English |
Qualification | Dipl.-Ing. |
Supervisors/Advisors |
|
Award date | 4 Apr 2014 |
Publication status | Published - 2014 |
Bibliographical note
embargoed until 17-03-2019Keywords
- Drilling
- Blasting
- Loading
- Hauling
- Overburden
- Trimouns
- Talc