Abstract

The industry, particularly the steel production sector, is associated with high energy and cost expenditure. With regard to future developments, companies have defined both a reduction in the CO2 footprint and the maintenance of operational services as targets. The increasing cost intensity of energy consumption requires a rethink aimed at utilising the energy consumed as efficiently as possible. In the case of large-scale industrial component production, where additional heat treatments are required, further development of existing process know-how is necessary in order to maximise the utilisation of existing furnaces and thus achieve an increase in energy efficiency. For this reason, this thesis analyses this step using the example of an ironworks. As part of this project, a planning tool was developed to reduce bottlenecks. The resulting heuristic or planning algorithm transforms information from process surveys and expertise into a discrete-event simulation model. This study focusses primarily on evaluating the resilience of the heuristic, which is evaluated in the form of a parameter variation and a subsequent sensitivity analysis. The underlying mechanisms of order planning and sequencing, which are discussed in the basic chapter, form the basis for the evaluation of this algorithm in the context of a comparison with the methods of current research work in the field of simulation of logistical models and systems. The results already provide basic recommendations for action for current order planning, whereby the simulation focuses less on recording energy savings and more on control techniques for increasing plant utilisation in the area of heat treatment machines.
Translated title of the contributionDevelopment of a planning tool for reducing bottlenecks in large component manufacturing: A study based on the example of an ironworks
Original languageGerman
QualificationDipl.-Ing.
Awarding Institution
  • Montanuniversität
Supervisors/Advisors
  • Hoffelner, Mario, Co-Supervisor (internal)
  • Zsifkovits, Helmut, Supervisor (internal)
Award date27 Jun 2025
DOIs
Publication statusPublished - 2025

Bibliographical note

no embargo

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Simulation
  • production planning and control
  • sequence planning
  • plant efficiency

Cite this