Abstract
Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
Original language | English |
---|---|
Pages (from-to) | 71-74 |
Number of pages | 4 |
Journal | Berg- und hüttenmännische Monatshefte : BHM |
Volume | 168.2023 |
Issue number | 2 |
DOIs | |
Publication status | E-pub ahead of print - 16 Jan 2023 |
Keywords
- dump design
- mine design
- mine plan
- scheduling