Abstract
Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
| Original language | English |
|---|---|
| Pages (from-to) | 71-74 |
| Number of pages | 4 |
| Journal | Berg- und hüttenmännische Monatshefte : BHM |
| Volume | 168.2023 |
| Issue number | 2 |
| DOIs | |
| Publication status | E-pub ahead of print - 16 Jan 2023 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 8 Decent Work and Economic Growth
-
SDG 12 Responsible Consumption and Production
-
SDG 15 Life on Land
Keywords
- dump design
- mine design
- mine plan
- scheduling
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver