The Dump is the Target—A Reversed Mine Plan

Research output: Contribution to journalArticleResearch

Abstract

Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
Original languageEnglish
Pages (from-to)71-74
Number of pages4
JournalBerg- und hüttenmännische Monatshefte : BHM
Volume168.2023
Issue number2
DOIs
Publication statusE-pub ahead of print - 16 Jan 2023

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 8 - Decent Work and Economic Growth
    SDG 8 Decent Work and Economic Growth
  2. SDG 12 - Responsible Consumption and Production
    SDG 12 Responsible Consumption and Production
  3. SDG 15 - Life on Land
    SDG 15 Life on Land

Keywords

  • dump design
  • mine design
  • mine plan
  • scheduling

Cite this