Research output

  1. Published

    HIGH-PRECISION SENSORS FOR DETECTING A MECHANICAL LOAD OF A MINING TOOL OF A TUNNEL BORING MACHINE

    Barwart, S. & Galler, R., 15 Oct 2015, IPC No. E21D 9/ 10 A I, Patent No. CA2944967, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  2. Published

    HOCHPRÄZISE SENSORIK ZUM ERMITTELN EINER MECHANISCHEN BELASTUNG EINES ABBAUWERKZEUGS EINER TUNNELBOHRMASCHINE

    Barwart, S. & Galler, R., 15 Oct 2015, IPC No. E21D 9/ 00 A I, Patent No. WO2015155124, Priority date 8 Apr 2014, Priority No. DE201410105014

    Research output: Patent

  3. Published

    HIGH-PRECISION SENSORS FOR DETECTING A MECHANICAL LOAD OF A MINING TOOL OF A TUNNEL BORING MACHINE

    Barwart, S. & Galler, R., 4 May 2017, IPC No. E21D 9/ 11 A I, Patent No. US2017122103, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  4. Published

    Disc cutter load monitoring system - DCLM

    Barwart, S., Galler, R. & Himmelsbach, C., 2015, See Tunnel. Promoting Tunnelling in South East European Region: Proceedings of the ITA-AITES World Tunnel Congress 2015. p. 594 595 p. 8.13

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  5. Published

    High-precision sensors for detecing a mechanical load of a mining tool of a tunnel boring machine

    Barwart, S. & Galler, R., 10 Nov 2016, IPC No. E21D 9/ 00 A I, Patent No. AU2015243595, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  6. Published

    HOCHPRÄZISE SENSORIK ZUM ERMITTELN EINER MECHANISCHEN BELASTUNG EINES ABBAUWERKZEUGS EINER TUNNELBOHRMASCHINE

    Barwart, S. & Galler, R., 15 Feb 2017, IPC No. E21D 9/ 11 A I, Patent No. EP3129593, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  7. Published
  8. Published

    Numerische Modellierung des Verformungszustandes hochbelasteter Abbauwerkzeuge von Tunnelbohrmaschinen

    Bumberger, T., Entacher, M., Winter, G., Godor, I. & Galler, R., 2011, Tagungsband "Berechnungsverfahren in der Geotechnik - Versagensmechanismen und Parameterentwicklung". p. 88-94

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  9. Published

    Drone Based Deformation Monitoring at the Tunnel Project Zentrum am Berg

    Chmelina, K., Gaich, A., Keuschnig, M., Delleske, R., Galler, R. & Wenighofer, R., 2018, WTC 2018 Paper Proceedings. Dubai, 14 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  10. Published

    Drone based deformation monitoring at the Zentrum am Berg tunnel project, Austria. Results and Findings 2017 - 2019.

    Chmelina, K., Gaich, A., Keuschnig, M., Delleske, R., Wenighofer, R. & Galler, R., 2019, Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art: Proceedings of the WTC 2019, Naples, Italy, 3-9 May, 2019. Vol. 1. p. 46 1 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

Previous 1 2 3 4 5 6 7 8 ...40 Next